Posts Tagged ‘Vitality’

The Vital Employee

With the introduction of overlay PTC just over a decade ago, the concept of vitality needed to be expanded at that point beyond the mantra of signaling engineers as to a vital component or system being one that fails in a safe manner, i.e., failure without introducing any additional risk.  In addition to this design vitality, it was necessary to introduce a concept of functional vitality to prove that PTC was and remains not vital. That is, a functionally vital entity is one that generates the movement authorities for trains, thereby providing for the integrity of train movements. For signal engineers the two concepts are inseparable, and in their viewpoint, anything associated with traffic control must by vital. Such fatuous rationalization can be quite unfortunate for the deployment of advancing technologies in railroads, including PTC. Two current examples here are ITC’s efforts in designing the wireless and positioning platforms for PTC that are way beyond what is required for a non-vital system, if even a vital one.

In anticipation of such design tangents by railroad technicians ( as demonstrated in the past by UP with it Precision Train Control project that died from overdesign), I introduced the functionally vital perspective a decade ago to demonstrate that overlay PTC is not vital and therefore not subject to the design and regulatory complexities associated with vital systems. Stated otherwise, PTC’s ability to enhance the safety of rail operations is substantially less critical than that of the traffic control systems that provide for the integrity of train movements. PTC only addresses human errors whereas traffic control systems are absolute.

Being the architect of the first overlay PTC system, I was continuously challenged during the early years by labor, FRA, suppliers, and even my counterparts on other railroads, to explain why PTC is not vital. The forum for these discussions was primarily that of the Rail Safety Advisory Committee (RSAC) for PTC that was charged with defining the core objectives of PTC. Understandably, RSAC-PTC was primarily manned by signal engineers who live and breathe vitality with their natural inclination being that everything is vital. Again, for them PTC had to be vital, I assume, because it addresses safety, and it is related to vital traffic control systems. At the same time, signal engineers when asked during the courses I teach on PTC and railroad operations “What is vital in dark territory?”, will respond that there is nothing vital since there is no wayside equipment. The solution for addressing both of these ill-structured mind-sets of signal engineers as to PTC and dark territory was to provide the functional definition of vitality that really goes to the core of running a safe railroad, i.e., the generation of authorities.

In parallel with the functional vitality effort was the extraordinary task of convincing the masses that PTC did not deliver those business benefits that continue to be so widely and wildly proclaimed by FRA and suppliers as to increasing traffic density and the efficiency of the key operating assets, e.g., crews, locomotives, and even maintenance crews. I quote the FRA’s website “In addition to providing a greater level of safety and security, PTC systems also enable a railroad to run scheduled operations and provide improved running time, greater running time reliability, higher asset utilization, and greater track capacity.” Here is the simple, and one would think very obvious, logic as to why overlay PTC can’t provide such business benefits. To increase traffic density means that the generation of movement authorities need to be done more efficiently … and since PTC does not generate movement authorities (nor deliver them as the FRA website proclaims – that is the purpose of digital authorities – not PTC), then it cannot provide those benefits.  Actually, if not properly designed, PTC can actually decrease both the traffic density and safety by making unnecessary enforcements. What the FRA and others who flaunt PTC business benefits refuse to understand is that it is the wireless data path required by PTC that also permits train tracking status data to be delivered to back office management systems.  As demonstrated by NS and BNSF at least, a railroad doesn’t need PTC to obtain the stated business benefits; a railroad only needs a wireless data platform, whether it be cellular, satellite, and/or private. In any event, the bottom line remains, i.e., PTC is not vital in any sense.

OK, at this point you may be thinking about VPTC (where V means vital) which is one title given to the PTC systems being pursued by the freight and commuter railroads. Clearly such a title suggests that PTC is vital, but it isn’t. VPTC means that the platforms upon which those PTC systems are deployed are design vital so as to reduce the failure of the PTC system, but PTC is still not functionally vital. The purpose of VPTC is to provide a pragmatic economical solution to regulatory issues that requires a restricted speed for a train should its PTC platform fail. In heavy density corridors, the application of restricted speed could result in significant business costs.

With the distinction between design and functional vitality now established above, I introduce a new vitality phrase: “Vital Employee”. Simply stated, a vital employee is one that generates a movement authority. For U.S. railroads, the primary example is the Employee-In-Charge (EIC) that provides the authority to a train to move through a work zone, a work zone that is encapsulated (nested) within an authority generated by a traffic control system. Handling the enforcement of the nested EIC authority was a major design issue that I had to provide for the first overlay PTC system … and is now used by the PTC systems being deployed by the freight railroads.  Again this was done in a non-vital way by not affecting the underlying Method of Operations, thereby avoiding regulatory complexities.

The vital employee perspective has proven to be particularly challenging in my assignment as Project Leader for a consulting effort in Egypt to advance both the safety and efficiency of the majority of the Egyptian National Railways (ENR) operations that use token block and TYER, a.k.a. British Absolute Block, traffic control systems. In the case of ENR, their operations have mechanical interlockings that are handled by operators independent of the central movement office. Instead of a centralized dispatcher, ENR uses block/interlocking operators to generate block-by-block authorities thereby compromising the efficiency and safety of train movements compared to that which railroads around the world achieve with dark and signaled operations. For this engagement, a “virtual” CTC (V-CTC) system is being designed that will provide for multiple block authorities subjected to nested, manual interlocking authorities. This solution provides for enforcement for the authorities generated by both V-CTC as well as the interlocking operator.

As a closing point, I wish to remind all that the Book of Rules provides the underlying threshold of vitality for all rail systems. In my 40+ years in the industry, I find that too many tend to ignore this point – just as signal engineers tend to ignore dark territory.

Teddy Bear – “PTC is Vital”

“PTC is Vital.”

It was a slow process, but perseverance has paid off.  This Teddy Bear as to PTC being vital has only the faintest shade of presence. Most individuals that have anything to do with PTC now understand that PTC is NOT vital. But, just in case, here’s the story.

It was in the earliest meetings of the PTC- Railroad Safety Advisory Committee (RSAC) process a decade or so ago that there was a great deal of confusion and misunderstanding as to what PTC was and what it did.  Indeed, the first primary task for the RSAC members, that included FRA, rail management, labor representatives, and suppliers, was to define the “core objectives” of PTC.  Within several RSAC sessions, the core objectives were determined to be 3-fold:

i.e.,

keep trains from hitting trains, keep trains from over-speeding, and keep trains from endangering work gangs.

An additional objective of protecting against grade crossings was introduced but readily dropped due to the physics of train movements and the ownership of the property. That is, to stop a freight train in time to prevent an accident involving a grade crossing situation, e.g., failure of gate to lower, would require such a long time for the gate to be lowered that the public would be more likely to run around the gates.  Additionally, the railroads in general own the property, and it is the public’s responsibility to watch out for trains – not the other way around.

Lastly, a fourth core objective has been added with the PTC mandate, i.e. prevent a train from moving through a misaligned switch. Once initial three core objectives of PTC were established, the next challenge for RSAC was to obtain a status of PTC efforts across the industry.It was at this time that I had the first of a number of opportunities to present Communications Based Traffic Management (CBTM), the PTC effort for which I was the architect at CSX.

CBTM was the first overlay approach to be developed, and as such it established the underlying basis for the current PTC pursuits by the freight railroads to meet the mandate. It also was the first overlay PTC project that had to confront the point of vitality. My first presentation to the RSAC members stating that CBTM was not vital began a long education process to get past various perspectives of vitality that existed at that time, as follows: First, key members of the FRA believed everything was vital in the overly-zealous spirit of zero tolerance for risk. Second, Labor thought by not being vital meant that the vitalities (lives) of the crew members were not being protected, as in “Does PTC apply the brakes or not?” Lastly, traditional signaling personnel, whether railroads or suppliers, view vitality as the state of failing safely, as in track circuits, relays, and control point logic. Hence, their logic proceeds that anything associated with that infrastructure needs to be vital as well thereby requiring extensive engineering, verification & validation (V&V), and duplication of hardware.

My challenge was to describe vitality in a fashion that would be acceptable to all.  The solution was to introduce an operational / functional perspective in lieu of the regulatory, technical, or humanistic ones. Simply stated, I defined vitality as the means by which movement authorities are generated so as to maintain the integrity of train movements. Hence, with such a definition, it follows that PTC is not vital since it has nothing to do with the generation, or even transmission, of movement authorities. (BTW, it is for this reason that PTC can not improve traffic density as discussed in another Teddy Bear Posting: PTC Business Benefits.) As the result of this effort, one issue of my quarterly journal, Full Spectrum, was so dedicated and titled Vital’s Vanity. As a closing point, it is appropriate to introduce here what is so often overlooked by people when they talk about vitality.  That is, there is a threshold of vitality that exists whether the territory is signaled, non-signaled, and does or does not have PTC or other enforcement systems. I am referring to the Book of Rules.

Follow StratRail on Twitter
Strategic Railroading™
Given recent tech advances there is now an unprecedented opportunity to advance railroad operations and the integration of high speed rail with freight. Real-time traffic management and communication is possible without significant development and deployment costs, but it will take a technology strategy working hand-in-hand with an operational strategy, it will take Strategic Railroading.™
Full Spectrum - Quarterly Journal

Full Spectrum is a quarterly railroading journal authored by Mr. Ron Lindsey. The majority of executives in the US railroad industry, including top members of the FRA and the major railroads, have subscribed to Full Spectrum for the past fifteen years.

Full Spectrum subscriptions are available by contacting Ron via email. If you are concerned with staying abreast of the newest advances in rail technology or operations strategy, it is highly recommended you subscribe in order to maintain your competitive advantage.

Back issues are on sale here.

Purchase Full Spectrum Issues
Your cart is empty
Visit The Shop